Remove any cleaning heads located above the freeze line (step or bench heads). Prepare for cold weather by plumbing the valve so it can be winterized easily. Remove the cassette assembly. Fluidra The Caretaker system first revolutionized pool cleaning nearly 50 years ago, said Drechsel, Now, with this new Revolution that makes cleaning swifter and more streamlined for superior results, were doing it again.. Place winterizing plugs into collars that are above water line to prevent runoff from filling the lines and refreezing. To contact Caretaker:Customer Service2580 S Decker Lake Blvd, STE 300West Valley City, UT 84119toll-free: 855.280.6465email: [emailprotected]www.caretakersystem.com. App Store is a service mark of Apple Inc. Google Play is trademark of Google, Inc. All other trademarks referenced herein are the property of their respective owners. (tap on the perimeter periodically to ensure equal tension). Starting at the cleaning head farthest from the valve, remove test plug and flush the pipe, blocking and releasing pressure several times to ensure a clear line. The valve can be placed near the other pool equipment for aesthetic purposes. Reduce run times by 2 hours every 2 days until minimum cleaning time is determined. Concrete or Vermiculite for Vinyl-Liner Ritz-Carlton Golf Resort, Naples Receives 2022 AI Dream Designs Honor, Check Out This Year's Dream Design Waterparks, These Family Aquatics Centers Take Dream Designs Recognition, See These Other Categories That Took Dream Designs Honors, The Cove at The Piazza Pool Awarded 2022 AI Dream Designs. Developed in 1972, Caretaker is the original in-floor pool and spa cleaning system. 2882 Whiptail Loop # 100 Consult manufacturers instructions for proper installationto protect the water valve and other pool equipment from high concentrations of chlorine or chlorine gas.Automatic Pool Cleaners: When using an automatic pool cleaner with the in-floor system, plumb the dedicated cleaner line (booster pump if applicable) before the valve (see Figure 4).Water Features, Falls and Returns: Plumb so the 6-port valve receives the GPMs mentioned in the certified design during the cleaning sessions.Filters: Use of a filter is required to maintain a warranty. Contact: 855.280.6465; caretakersystem.com, Pool & Spa News: Trends, news, products, design and business strategies for pool and spa professionals, Easy Sanitary Solutions Introduces Pool Drains, Reliant Pool Products Introduces Pump for Extreme Environments, New Customizable Grate Adds to RenoSys Line, Nidec Motor Corp.'s Aqua-Shield Line Features Moisture Resistance. Excavate a niche in pool wall, 6 x 24 (15.2 cm x 61.0 cm) down to the pool floor. Should the system fail, this trapped air can propel debris at a high speed and cause injury. Designed with service technicians in mind, Revolution sets the new standard for in-floor cleaning valves with unsurpassed durability, increased efficiency and ease of servicing. Refer to the design plan to verify nozzle size. If all outlet ports on the valve are not needed, double-port the line by tying the unused port into an active port. Use glue on both.). ZODIAC is a registered trademark of Zodiac International, S.A.S.U., used under license. Excavate an area (12 in. If the Caretaker cleaning system displays the following actions, adjustments may be necessary to restore performance. The 6-port valve provides dependable and efficient in-floor cleaning by maximizing water flow through strategically placed cleaning heads to give your pool a robust and thorough cleaning. The 6-Port Revolution valve is a hydraulically-driven, in-floor pool cleaning system from Caretaker. Ensure cassette assembly is removed. Turn counter-clockwise (1/4 of a turn) to release head from collar. Cut pipe stub-up flush with the pool floor. Refer to the design plan for the proper connections.CAUTION: Always plumb a check valve in each doubleported line. If any dimensions have changed, a new plan must be drawn to ensure cleaning and warranty.Position the valve as close as possible to the swimming pool or water feature to reduce piping and improve performance. Carlsbad, CA 92010, Introducing Caretaker Revolution the most durable in-floor pool cleaning valve. Risers or stub-ups are glued into 2 (5.1 cm) Tees, 90-degree elbows, to stub-ups through the pool shell.Match the riser width to collar width. Press locking ring firmly into place in groove on collar fitting. This is the most durable in-floor pool cleaning valve built. Failure to follow warning notices and instructions may result in property damage, personal injury, or death. All other trademarks are the property of their respective owners. NEW Jandy TruDose provides advanced technologies to properly maintain pool chemical levels. Remove the protective caps from the collars. A Dozen Ways to Strengthen Your Remodeling Brand, Decoding the Framing Square for Rafter Layout, New Tool: Metabo HPT MultiVolt Cordless Compressor, A Deck Builder's Guide to 'Google My Business', JLC Rolls Out Deck and Railing Skills Workbook, Webinar: What You Need to Know About Decking. WARNINGFOR YOUR SAFETY This product must be installed and serviced by a contractor who is licensed and qualified in pool equipment by the jurisdiction in which the product will be installed where such state or local requirements exists. For Vinyl Liner Pools:Set collar fittings before clearing lines. CAUTIONTo prevent freeze damage in cold climates, remove water from the feed lines that are above the freeze line and seal the valve.

Featuring an all-new design and industry-exclusive technologies, Revolution is built for ultimate durability. Run the system for a complete cycle to confirm that all cleaning banks operate and that each head advances during pop-up and retraction. The result, more debris is flushed out of the pool with reduced head loss. caretaker jandy Insert winterizing plugs into ports on the valve bottom or use 2-way valves on each line. Find a pool builder, retailer, or service professional in your area.

(see Figure 11). WARNINGInstallation of this equipment should be performed by a licensed pool contractor and conform to the National Electrical Code (NEC) . Turn on blower and water supply and direct the flow to one zone at a time. Heads should be positioned 2 in. 2580 S Decker Lake Blvd, STE 300 West Valley City, UT 84119855.280.6465 toll-free | 801.906.6701 fax[emailprotected]www.caretakersystem.com. Verify that the system is holding pressure (minimum of 35 psi), then relieve system pressure. Six hours a day is recommended. However, a high speed cleaning session will still be required to clean the floor of the pool. Fine tune your system by finding the minimum speed required to fully lift the heads. If a spa is included, it will require a dedicated line from the valve. (Primer can be used on the stub-ups but not the collars. If these instructions are not followed exactly, a fire or electric shock could result, causing property damage, personal injury, and/or death. We're looking for the best and brightest to join us as we innovate, collaborate and dedicate our efforts to driving the future of the perfect pool and wellness experience. Installed to fit flush with your pool floor makes the system virtually invisible to the eye while continuously working to keep your pool clean and provide complete circulation of water, heat, and chemicals. Use compressor or blower to blow water from discharge lines. Available In Store only. Keep the water valve secure and under pressure throughout the construction process. Every effort to remove trapped air must be taken.Pressure testing applies only to the plumbing and not to the pool equipment such as the filters, pumps, and heaters. Dig trenches 8 in. This ingenious valve offers effortless internal accessibility with a single band clamp that allows for quick access to the conveniently replaceable one-piece gear cassette. WARNINGTo reduce the risk of electrical shock: Install all electrical equipment at least 5 feet (1.5 m) from inside wall of pool or spa. Disconnect power before servicing this equipment. Verify all stub-ups are above the pool shell. With Revolution, Caretaker also introduces the new QuickFlow Hydraulic Shifting System that provides the fastest shifting times tested, working even with low pump speeds, and maximizes full-pressure cleaning time with smoother zone shifting. Discharge pipes should extend 24 below the freeze zone before turning toward the pool. During gunite application, leave a 1 (2.5 cm) deep x 1 (2.5 cm) wide well around each stub-up. Verify proper water pressure at the gauge near the water valve. Improper installation and/or operation will void the warranty. (see Figure 3). Stake but do not plumb lines until walls are set; plumbing lines are fed under walls. Check the break, width, depth, and designated step/bench locations. WARNINGThis manual contains important information about the installation, operation, and safe use of this product. Lift straight up to release head from the removal tool. To maintain flow through the heads, run the system whenever the pump is on. Featuring industry-exclusive technologies, Revolution is uniquely constructed using a heavy-duty valve plate with integrated ball bearings and extra thick gears supported by dual-reinforced shafts, which produces a strong hydraulic drive system capable of standing up to high pressures for years to come. Caretaker design dimensions are from the finished pool, not excavation. Use a check valve on the feed line in elevated spas to prevent spa water from flowing back into the pool.Follow the certified design plan to position and stake the cleaning head locations. Should You Consider Switching to Cost-Plus Pricing? Attach the Head Removal Tool (part number 3-17-8) to the pool pole. Before installing this product, read and follow all warning notices and instructions that accompany this product. Each Caretaker system is custom designed for the unique size and shape of your pool. 2020 Zodiac Pool Systems LLC - All rights reserved. Ever. Each head has a designated nozzle that has a precise cleaning radius (see Figure 1). And, if the valve should ever have a problem, it remains open eliminating dead head and protecting the plumbing, pump and filter. (20.3 cm) below excavated floor) and fill with concrete to form a thrust block to eliminate movement of the cleaning head. For technical assistance, contact Caretaker for assembly instructions. SAN DIEGO July, 8 2019 Caretaker, the original in-floor pool and spa self-cleaning system, is taking in-floor cleaning to new levels of efficiency with its latest innovation the Caretaker Revolution 6-Port Valve. However, the installer must follow the pipe size guidelines found on the certified pool plan which includes a minimum requirement of 2 PVC SCH40 for all floor inlets.Install the valve so that the body housing and outlet ports are above ground and the finished pool water level. Lay out system so feed pipes enter the pool in the center of the wall closest to the pool equipment and valve.

Use a 3 in. Refer to the manufacturers instructions for the pumps, filters, and heaters for instructions regarding the maximum pressures the pool equipment can be subjected to. 2 collars require 2 class 200 pipe (no reaming required) or 2 schedule 40 pipe (reaming required), 2.5 collars require 2.5 (6.35 cm) Schedule 40 Pipe (no reaming required), Position stub-up perpendicular (90) to the slope of the finished pool floor and secured to avoid movement durring gunite process. Make line trench depth sufficient to cover all pipes with 6 (15 cm) of soil. To ensure complete cleaning and to qualify for the 99% cleaning guarantee, the pool builder must fax or email a Design Fact Sheet along with a scaled pool plan for FREE In-Floor DesignService prior to plumbing the pool.Email: [emailprotected]Fax: (801)-906-6701If the pool design or dimensions change during excavation, a new design plan must be drawn, or the cleaning guarantee will be void. Use a blower assembly unit (blower, check valve, air/water supply, and connectors) to blow out debris that can gather in the plumbing during the construction process. Use heavy bodied PVC glue to connect the PVC pipe to the valve housing using glue manufacturers instructions.

Home CARETAKER CARETAKER REVOLUTION 6-Port Valve Installation Guide, REVOLUTION6-port valveInstallation and Maintenance Guide. The pump can be run through out the day at low RPMs, allowing water rotation through the filtration system. Refer to instructions on Page 11. (4.8 cm) lower than the floor level. The company has a rich heritage of innovation excellence dating back more than 100 years and markets its product lines under the leading brand names of Zodiac, Polaris, Jandy, Nature2, Caretaker, Grand Effects and Cover-Pools. In the event no such state or local requirement exists, the installer or maintainer must be a professional with sufficient experience in pool equipment installation and maintenance so that all of the instructions in this manual can be followed exactly. WARNINGWhen pressure testing a system with water, air is often trapped in the system during the filling process. Pressure-test the system at a minimum of 35 psi for 24-48 hours or as local code requires.

Verify that the excavated pool matches the Caretaker-certified pool plan. Install the o-ring, lid and band clamp and torque clamp to approx. Caretaker Announces Revolution 6-Port Valve. They glue directly into 2 schedule 40 fittings, dont require reaming and are ready for pressure testing.

Ensure proper water flow can be reached.Chlorinators: In-floor systems can be used with erosion feeders, ozone generators, and in-line salt-chlorine generators. Replace test plug and repeat for each riser. Size the filter to exceed the flow requirements of the certified design. Consult manufacturers installation instructions. The Caretaker-certified pool plan indicates which cleaning heads will be plumbed together to form a bank. (20.3 cm) below excavation grade to accommodate setting of fittings. All rights reserved. Run the in-floor system without cleaning heads installed for 24 hours to ensure the lines are clean. Position o-ring in place and replace lid. WARNINGRead these instructions completely before starting the procedures. Number the lines according to the design plan (see Figure 2). Zodiac Pool Systems LLC, a Fluidra company, is a global manufacturer of residential pool equipment and connected pool solutions. Its passed the most rigorous tests we have ever conducted; you can be certain these valves will stand the test of time.. Mark the cleaning radius around each stake to verify cleaning coverage (Figure 2). Perimeter heads have a 1 ft. (0.3 m) overlap. Replace band clamp and torque to approx. Perform a Hydrostatic pressure test by filling each line and the 6-Port valve with water. The Revolution 6-Port Valve from Caretaker In-Floor Pool Cleaning Systems is designed to be durable, efficient and easy to service. Snap tool into the head. WARNINGTo reduce the risk of injury, do not allow children to handle this equipment unless they are closely supervised. Improper installation and/or operation will void the warranty. This is the most durable in-floor pool cleaning valve weve ever built, said LaMont Drechsel, Vice President and General Manager, Caretaker. Tighten the collar into the collar fitting, turning clockwise until the collar lip fits snugly against locking ring. Failure to follow recommended installation methods and maintenance procedures could cause damage to pool equipment and/or personal injury, and may void the warranty. Apple and the Apple logo are trademarks of Apple Inc., registered in the U.S. and other countries. For Vinyl Liner Pools:Pool liner must be in final position before installing collars and cleaning heads (see Figure 10). Electrical cost savings can be gained by using a variable speed pump. Isolate the plumbing so that the filter, pump, and heater are not subjected to the pressure test. Fluidra strives to deliver the perfect pool experience that enhances comfort, enjoyment, and peace of mind for pool owners. When all connections are complete and it is clear that the system is holding pressure, backfill, tamp and level all trenches. Perform a temperature risetest to determine where to set the bypass valve (see Figure 7). Attach the Head Removal Tool (part #3-17-8) to the pool pole. Refer to exploded parts diagram for part references. Install the valve above ground and the finished pool water level. If a port is used as a return line, install an eyeball fitting at the pool wall to create back pressure on the line.

Plumb 2-way valves into each discharge line so they can be pressurized to push water below the freeze zone and sealed to prevent water from coming back up into the valve. Use 45 and sweep elbows to improve water flow. Looking down on the valve, it rotates clockwise. The HydroMax shifting mechanism maximizes the time of full cleaning pressure to each zone. Zodiac Caretaker Revolution 6-Port Hydraulic In-Floor Cleaning System, 2" Ports | WK000030, View Cart {{shoppingcart.totalQuantityDisplay}} Item(s), #WK000030 Zodiac Caretaker Revolution Hydraulic 6-Port Valve Complete with 2" Outlet Ports, #WK000030Zodiac Caretaker Revolution Hydraulic 6-Port Valve Complete with 2" Outlet Ports. Pool Equipment site managed by Itsopro Consulting | 2022 TC Pool Equipment Co. Not available online. Installation Tip: Turn collar upside down and use as a tool to press ring into place. Body housing must be primed heavily before gluing. Clear debris from all filters and pump basket. Push collar firmly into pipe with a 1/4 turn. Your email address will not be published. Clean the pool filter whenever pressure increases 3 psi above normal clean-filter operating pressure.

Comment document.getElementById("comment").setAttribute("id","a7b45c1eb6cb6914a7304c4dfa1aa9dc");document.getElementById("afe6277d1c").setAttribute("id","comment"); Save my name, email, and website in this browser for the next time I comment. Port 1 should always be the step or bench port, followed by the shallow bank, etc. Ultra-durable valve plate with ball bearings, WK000030Caretaker 6 Port Valve, 2 Inch Outlet Ports Complete. Attn: Customer Support ZODIAC is a registered trademark of Zodiac International, S.A.S.U., used under license. To minimize risk of severe injury or death the filters, pumps, and heaters should not be subjected to the piping pressurization test. Copyright 2022 Zonda Media, a Delaware corporation. Top of stub-ups must be 6 (15.2 cm) above finished elevation. When the pool interior is completely clean and ready for the final finish application, install the collars (see Figure 9).

Use heavy bodied PVC glue to secure the cleaning collars. Use 90 elbows or tees at each head location. Then use an inside pipe cutter to cut it again 1 in. The distribution system is designed to rotate from the shallow end to the deep end; pushing debris to the drain. Insert Metal Combination Tool (part #3-17-7) into collar and rotate clockwise until collar is firmly seated. Improper installation and/or operation can create an unwanted electrical hazard which can cause serious injury, property damage, or death. For optimum cleaning efficiency, routinely clean the pool pump basket, skimmer and filter screens. 95 inch-pounds. Before initiating the system, open a discharge line before the valve and flush the pool pump and filtration system. Trade Grade Series. (5.1 cm) from the outer edge on steps and benches. Cleaning times will vary according to application and environment. If the wall return line can also recieve water pressure from the pump, install a check valve between the Caretaker valve and wall returns to prevent water from back flowing into the valve.

95 inch-pounds. The cleaning head MUST be in the full down position before removal (see Figure 13). Pump: Choose an appropriate pump size and style to meet the GPM flow rate minimums specified on your certified pool plan. To determine the optimum cleaning time, run the system 24 hours a day to start. All applicable local installation codes and regulations must be followed. 2020 Zodiac Pool Systems LLC. The Caretaker system replaces unsightly vacuum hoses and other stand-alone pool cleaners so your pool area is uncluttered and always ready to be enjoyed. For variable speed pumps, see page 12.Heaters: To compensate for heater system pressure drops, plumb heaters in a bypass line before the water valve, even if the heater has an internal bypass. Install other check valves (as normal) to avoid spa return jets and suction lines from draining. Use a sander/grinder to sand each stub-up smooth and level with the shell finish to ensure proper glue adhesion with collar setting. A new one-piece gear cartridge also makes the valve easier than ever to service. Use a razor knife to cut liner inside the locking ring, leaving at least a in. on CARETAKER REVOLUTION 6-Port Valve Installation Guide, resideo Braukmann VT300 Installation Guide, resideo Braukmann VV300 Installation Guide, resideo Braukmann SV300 Installation Guide, Razor MX125 Charger Port Installation Guide, AJAX 8706 KeyPad Wireless Touch Keyboard User Manual, Meizhou Hongfeng Arts Crafts 266285 BJ 57IN Snowman With Snowflakes Instruction Manual, AJAX 7661 StreetSiren Wireless Outdoor Siren User Manual, AJAX 17938 12V PSU for Hub/Hub Plus/ReX Power Supply Unit User Manual, AJAX 10306 Transmitter Wired to Wireless Detector Converter User Manual, ZERFUN G8 Pro Wireless Microphone System User Manual, Airrex Infrared Heater AH-200/300/800 User Manual, 2017 Toyota Camry Hybrid LE Fuse Box Diagrams, 2017 Mitsubishi Lancer 4WD Fuse Box Diagrams, Mitsubishi Lancer Passenger and Engine Fuse Box Diagram, Mira Honesty ERD Bar Valve and Fittings User Manual. Remove the band clamp and lid. Install all lines with a minimum of 6 (15.2 cm) cover or in accordance with local codes. We exist to create the perfect pool experience by designing innovative solutions that increase comfort, enjoyment, and peace of mind. (see page 8). (30.5 cm) around head and 8 in. Install the discharge lines from the valve in a stacked or flat configuration. Refer to the manufacturers instructions of the filter for proper cleaning instructions. Set head in collar; make sure the head is completely in the collar. Install the nozzles into the cleaning head. Engineered for hassle-free maintenance, pool professionals will appreciate the ease with which Revolution can be serviced. (7.6 cm) stagger when cutting pipes to provide enough clearance for the elbows. Turn clockwise (about 1/4 turn) to lock the head into position. Customarily, double-port lines to the hardest-to-clean area. Open the valve and remove cassette assembly and packaging prior to gluing. Apple is not a participant or sponsor of this promotion.