This number represents the median, which is the midpoint of the ranges from our proprietary Total Pay Estimate model and based on salaries collected from our users. ka5b \4N |"r!Y That said, there is a risk under certain instances that there may not be sufficient Reuse Proceeds to construct all of the Water System Replacements in a given phase, if subsequent sales of property do not occur before award of construction contract.
Feasibility Study. Thus, the City would remain the customer of record with EBMUD, would receive water from EBMUD through its master meters, and provide water to the Reuse Parcels within Alameda Point through its own water infrastructure until the Water System Replacements are constructed. the necessary planning documents for redevelopment of Alameda Point, including the Master Infrastructure Plan for Alameda Point (MIP). The Feasibility Study is already prepared and approved by EBMUD for the Phasing Plan and is attached to the Water Infrastructure Agreement as Exhibit D. The Feasibility Study shows that through the sale of the buildings with purchase options more than sufficient Reuse Proceeds exist to implement the cost of the Water System Replacements in the Reuse Area, which cost approximately $14.4 million ($5.5 million for Phase 1, $5.9 million for Phase 2, and $3.0 million for Phase 3). [(0o5"-@D ;RPCl7@GP5psRA'"n :'xMMNMXF,K;B_WI"FO6 Is the category for this document correct. On April 23, 2017, EBMUD and the City entered into a short-term six-month agreement (Short Term Agreement) for EBMUD to provide specific maintenance services for the Navy Water System at Alameda Point (Exhibit 3). STANDARD DRAWINGS - East Bay Municipal Utility District.
This Phasing Plan is the Citys current plan for phasing of infrastructure in the Reuse Area based on available information and existing lease and sale agreements in the Reuse Area. Some related job titles are.css-1c1umss{cursor:pointer;font-size:15px;line-height:24px;color:#1861bf;}.css-1c1umss:hover{color:#0c4085;}Commercial Construction Superintendent salaries with median pay of $95,625,Construction Field Superintendent salaries with median pay of $87,298,Construction Inspector salaries with median pay of $86,221,Construction Manager salaries with median pay of $96,097. 1. In order to be a customer of EBMUD, a property owner must have direct access to Water System Replacements. )[\$#0DM!KDx0Xt@"}D Water was supplied to the Navy Water System by East Bay Municipal Utility District (EBMUD) through three master meters located on the perimeter of NAS Alameda. fb`gb`s. $
The estimated total pay for a Construction Superintendent at EBMUD is $87,184 per year. The DIF payments, and any additional proceeds from the sale of land and buildings in the Reuse Area are required by the Navy to be reinvested back into Alameda Point, to implement the New Infrastructure. That said, City staff may attempt to implement some or all of the New Infrastructure, including other wet and dry utilities and surface street reconstruction at the same time as the Water System Replacements to economize on trenching costs, if sufficient Reuse Proceeds exist. Through a series of modifications and extensions the JPA was continued through March 31, 2017. Upon receipt of funds from the sale of the properties within the Reuse Area, the City will oversee the logical implementation of the New Infrastructure in the Reuse Area.
54 0 obj
<>/Filter/FlateDecode/ID[]/Index[49 7]/Info 48 0 R/Length 36/Prev 612274/Root 50 0 R/Size 56/Type/XRef/W[1 2 0]>>stream
Lastly, all future property owners will be notified in a letter from the City, and required to acknowledge in writing, the water infrastructure situation in the Reuse Area and the Water Infrastructure Agreement. Its very important for us!
If the Water System Replacements are implemented separately from the other utilities and improvements, there is a marginal premium that the City will be paying, which is estimated at approximately $2 million or three percent of the total cost of New Infrastructure for these three phases. Once the first sale occurs, the City is obligated to commence the design and engineering process for the Water System Replacements for Phase 1. All new development and property transfers to private property owners require the payment of the DIF to fund New Infrastructure. On July 5, 2014, the City of Alameda adopted the Alameda Point Development Impact Fee Ordinance (DIF) consistent with the MIP, which created a required mechanism for financing the New Infrastructure for Alameda Point based on the costs estimated in the MIP and escalated annually. City staff have already retained outside water experts to advise the City in the process and approach to privately contracting these services. Must work extended hours including weekend and holidays as required. For instance, if the Building 91 sale of $3 million occurred first and no other sale occurred within the 30-month timeframe, there would be insufficient Reuse Proceeds to complete the full $5.5 million Phase 1 Water System Replacements or a $2.5 million funding gap. The existing businesses at Alameda Point did not have to pay these charges prior to opening their businesses, which in many cases has been for years, unlike other businesses in the rest of Alameda. How accurate does $57,381 - $132,469 look to you? The Water Infrastructure Agreement (Exhibit 2) is intended to set forth the process of the City and EBMUD working together and the detailed steps that the City will follow to finance and construct Water System Replacements in the Reuse Area and obtain compliance with EBMUDs regulations. See Exhibit C of the Water Infrastructure Agreement for the Phasing Plan, which includes three phases, and indicates the buildings with purchase options. Domestic Water Line (3" and Smaller) Trench, Domestic Water Valve (1.5" and Smaller) Without Unions, Domestic Water Valve (1.5" and Smaller) With Unions. The New Infrastructure includes construction of new EBMUD owned and operated water mains for potable water and fire protection systems compliant with EBMUD specifications and consistent with the MIP (Water System Replacements). Throughout the term of the JPA and short-term agreement, the City remained EBMUDs customer, receiving water to Alameda Point through the same three master meters as the Navy. (Put this form on your Companys letterhead stationery (Date), LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER, Date: Contractor's Name Contractor's Address, 2013 - 2022 studylib.net all other trademarks and copyrights are the property of their respective owners.
This may not be possible given the significant cost of the complete New Infrastructure estimated at $70 million for all phases within the Reuse Area ($18.4 million for Phase 1, $32 million for Phase 2, and $19.4 million for Phase 3) and the agreed upon timeline for complying with this agreement, as described in greater detail below. In addition, the routine maintenance costs will be limited to $10,000 per month or less. If the Water System Replacements are implemented separately from the other utilities and improvements, there is a marginal premium that the City will be paying, which is estimated at approximately $2 million or three percent of the total cost of New Infrastructure for these three phases. Performing this action will revert the following features to their default settings: Performing this action will permanently remove your draft from Yumpu. At the time of sale or at the time the Water System Replacements are implemented (whichever is earlier) all of the tenants and owners who front or will front the Water System Replacements must pay all applicable fees, including the System Capacity Charges (SCC) and the Wastewater Capacity Fees (WCF), which are typically due when a business obtains water service before they open their business. Related Searches:All Construction Superintendent Salaries|All EBMUD Salaries. Must be able to work out of doors in a variety of weather conditions. System Capacity Charges and Credits for Water and Wastewater Use. Your file is uploaded and ready to be published. EBMUD has taken the position that if property sales were to occur in the Reuse Area prior to or without the Water Infrastructure Agreement being executed, then individual parcels would be out of compliance with EBMUDs regulations and would be required to install expensive water main extensions, effectively rendering these projects infeasible or the City may face legal action by EBMUD. The City is required to demonstrate to EBMUD that sufficient Reuse Proceeds exist to implement the Water System Replacements through a feasibility study (Feasibility Study). . The Water Infrastructure Agreement is crucial to moving forward with incremental property sales in the Reuse Area, which allows the City to finance New Infrastructure in this area and attract high intensity employment generating businesses. The City, in consultation with its civil engineering consultants, have prepared a logical and cohesive plan for phasing the infrastructure in the Reuse Area (Phasing Plan) to address upgrades to infrastructure for the parcels with existing leases that include options to purchase. PPO and POS requires employee contributions., EBMUD offers both maternity and paternity leave that enables new parents to spend time with their newborns. The Water Infrastructure Agreement (Exhibit 2) is intended to set forth the process of the City and EBMUD working together and the detailed steps that the City will follow to finance and construct Water System Replacements in the Reuse Area and obtain compliance with EBMUDs regulations. endstream endobj 50 0 obj <> endobj 51 0 obj <>>>/Rotate 270/Type/Page>> endobj 52 0 obj <>stream The Feasibility Study is already prepared and approved by EBMUD for the Phasing Plan and is attached to the Water Infrastructure Agreement as Exhibit D. The Feasibility Study shows that through the sale of the buildings with purchase options more than sufficient Reuse Proceeds exist to implement the cost of the Water System Replacements in the Reuse Area, which cost approximately $14.4 million ($5.5 million for Phase 1, $5.9 million for Phase 2, and $3.0 million for Phase 3).
Are you sure you want to delete your template? The total cost of New Infrastructure is approximately $600 million or $1 million per acre. Recommendation to Authorize the City Manager to Execute a Water Infrastructure Agreement for Alameda Point with East Bay Municipal Utility District (EBMUD) to: (1) Address the Implementation of New Water Infrastructure in the Reuse Area; and (2) Extend the Existing Short-Term Maintenance and Operations Agreement for the Existing Water System and (3) Accept Credits in System Capacity and Wastewater Capacity Fees from EBMUD. On February 4, 2014, the City of Alameda certified the Alameda Point Final EIR in compliance with the California Environmental Quality Act (CEQA). . As described above, the first sale of any of the parcels will generate sufficient Reuse Proceeds to complete the design and engineering process for any phase, and the Feasibility Study demonstrates that sufficient Reuse Proceeds should exist to complete the Water System Replacements for each of the phases in the Phasing Plan. Due to the fact that the Reuse Area is comprised of the NAS Alameda Historic District that constrains the new development process, the buildings within the Reuse Area are planned to be sold and reused incrementally by private property owners on a parcel-by-parcel basis prior to New Infrastructure being constructed. Prior to closure of the former Naval Air Station Alameda (NAS Alameda), commonly referred to as Alameda Point, the United States Navy (Navy) designed, owned and operated the potable water system at Alameda Point (Navy Water System). Copyright 20082022, Glassdoor, Inc. "Glassdoor" and logo are registered trademarks of Glassdoor, Inc. { "name": "Native_infosite_salary_detail_fluid_en-US","id": "div-AdSlot-l6757qxj", "fluid": true }. This design and engineering process is estimated to take approximately 30 months before coming to the City Council with an award of construction contract and then another 18 to 24 months to complete construction for a total of over four years from commencement of design to completion of construction. The phased approach to financing and implementing the New Infrastructure contemplates the City selling parcels to private property owners within the Reuse Area (Reuse Parcels) before direct access to the Water System Replacements is constructed, which is inconsistent with EBMUDs regulations.
The City is required to demonstrate to EBMUD that sufficient Reuse Proceeds exist to implement the Water System Replacements through a feasibility study (Feasibility Study). City staff will bring a subsequent action item to the City Council to provide direction on how the City should allocate these SCC and WCF credits to future users. Must possess a valid California driver's license and have a satisfactory driving record. Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software. average salary for a Construction Superintendent is $75,535 per year in United States, salary trajectory of a Construction Superintendent. For example, a residential project of 800 multi-family housing units would pay approximately $9.4 million and an industrial project of 50,000 square feet would pay approximately $300,000 in SCC and WCF to EBMUD. Property owners within EBMUDs service area must be EBMUDs customers consistent with EBMUDs regulations. The estimated base pay is $87,184 per year. The Final EIR evaluated the environmental impacts of redevelopment and reuse of the lands at Alameda Point consistent with the Alameda Point Zoning Ordinance and MIP, which included the Reuse Area. endstream endobj 53 0 obj <>/Filter/CCITTFaxDecode/Height 1700/Length 46075/Subtype/Image/Type/XObject/Width 2200>>stream The "Most Likely Range" represents values that exist within the 25th and 75th percentile of all pay data available for this role. All of the Water System Replacements must be a looped system that tie back to an EBMUD mainline in order to satisfy EBMUD specifications and regulations. System Capacity Charges and Credits for Water and Wastewater Use. phased replacement of all of the Navys outdated and substandard utility infrastructure, including water, sewer, storm drain, electrical, gas, telecommunications, and surface street improvements. [ Check out the latest Construction Superintendent Jobs or see Construction Superintendent Salaries at other companies. Detailed Implementation Process. Theres an original pension plan and a 2013 plan. This may not be possible given the significant cost of the complete New Infrastructure estimated at $70 million for all phases within the Reuse Area ($18.4 million for Phase 1, $32 million for Phase 2, and $19.4 million for Phase 3) and the agreed upon timeline for complying with this agreement, as described in greater detail below. Until direct access to Water System Replacements can be provided to the Reuse Parcels, the City will continue to provide water to the new owners through the Navy Water System. As part of the Water System Replacement work, the City is required to connect all domestic and fire services to parcels fronting streets that contain the new EBMUD water system to the new EBMUD water main and facilitate owners and tenants becoming EBMUD customers in accordance with EBMUDs regulations. The HMO is fully covered. The New Infrastructure includes construction of new EBMUD owned and operated water mains for potable water and fire protection systems compliant with EBMUD specifications and consistent with the MIP (Water System Replacements). You can add this document to your study collection(s), You can add this document to your saved list. On April 26, 2017, the City and EBMUD entered into a short-term services and operations agreement for six months until the issues surrounding implementing new infrastructure in the adaptive reuse areas at Alameda Point could be resolved, which is the topic of this evenings item. Short Term Agreement for Operations and Maintenance of Existing Water System at Alameda Point, pon acquisition of major portions of Alameda Point from the Navy. EBMUD recognizes that it is in the Citys and EBMUDs mutual interest to work together in implementing the MIP and New Infrastructure, including the Water System Replacements, for Alameda Point. endstream endobj startxref There is no impact to the General Fund as a result of this action.
The Water Infrastructure Agreement allows for other phasing plans to occur as long as they implement improvements that include a looped water system that tie back to an EBMUD mainline and a feasibility study is prepared and approved by EBMUD (see below).
For instance, if the Building 91 sale of $3 million occurred first and no other sale occurred within the 30-month timeframe, there would be insufficient Reuse Proceeds to complete the full $5.5 million Phase 1 Water System Replacements or a $2.5 million funding gap. %PDF-1.3 % This design and engineering process is estimated to take approximately 30 months before coming to the City Council with an award of construction contract and then another 18 to 24 months to complete construction for a total of over four years from commencement of design to completion of construction. hb```f`` z^ a0p/roTC%|cY"N`/d330d`2p-@| As part of the design and engineering process, City staff will evaluate whether sufficient Reuse Proceeds exist to complete not just the Water System Replacements, but all or some portion of the New Infrastructure and be part of any subsequent recommendation to the City Council. No further review is required for this review of this agreement. Until direct access to Water System Replacements can be provided to the Reuse Parcels, the City will continue to provide water to the new owners through the Navy Water System. uz] H*2430P A3CN$r{(sr
See Exhibit C of the Water Infrastructure Agreement for the Phasing Plan, which includes three phases, and indicates the buildings with purchase options. As shown in Exhibit D of the Water Infrastructure Agreement, the City expects the first parcels to sell to be Building 9 and 91 within Phase 1 of the Phasing Plan. These credits could be used to offset the SCC and WCF for new projects in the Development Area and new businesses in the Reuse Areas at the City Councils discretion. Thus, the City would remain the customer of record with EBMUD, would receive water from EBMUD through its master meters, and provide water to the Reuse Parcels within Alameda Point through its own water infrastructure until the Water System Replacements are constructed. Map of Reuse and Development Areas, 2. The Navy Water System was neither built, nor maintained to the standards of EBMUD. This provides a greater credit amount to the City because the credits are based on a 10-year historic average of water use, which is higher now than when the master meters will actually be eliminated, as water usage will gradually decrease over time as water improvements are constructed and there is lower usage of water flowing through the Navys former master meters. As part of the Water System Replacement work, the City is required to connect all domestic and fire services to parcels fronting streets that contain the new EBMUD water system to the new EBMUD water main and facilitate owners and tenants becoming EBMUD customers in accordance with EBMUDs regulations.
DCD [*aN[b!| ]8 D|.D`J3X.9QI8DGr,/xav". EBMUD does not want to continue to operate the Navy Water System. Must possess the physical characteristics to perform the critical and important duties of the class. As described above, the Water Infrastructure Agreement provides the detailed steps that the City will follow to implement the Water System Replacements in the Reuse Area to obtain compliance with EBMUD regulations.
That said, EBMUD has agreed to give the City a credit for the future elimination of the three master meters of $19.5 million for SCC and $7 million for WCF at the time the Water Infrastructure Agreement is executed instead of at the later date when the master meters are actually eliminated (see Exhibit E of the Water Infrastructure Agreement). 000 - 099: General100 - 199: Bollards200 - 299: Fences and Gates300 - 399: Sign Installation400 - 499: Roads, Trails, and Parking500 - 599: Furnishings600 - 699: Planting and Irrigation700 - 799: Utilities and Drainage800 - 899: Miscellaneous, Abbreviations Painting and Staining Specification, Fixed Steel BollardRemovable Steel Pipe BollardRemovable PVC Bollard, One-Rail Wood FenceTwo-Rail Wood FenceSplit Rail Wood FencePipe Gate InstallationPipe Gate FabricationTrail Service GatesPlank Gate, 07/08/202210/11/202111/19/202104/06/202204/06/202204/06/202204/06/2022, Steel Pipe Sign PoleSingle Wood Sign PostPark Entry Wood Sign-Post Mount, Standard Parking StallAccessible Parking StallsConcrete Wheel StopRegional Trail Entry StructuresControlled Vehicle Entry, 12/08/201511/19/202111/19/202105/14/202110/11/2021, 503503F504504F507507F510515518520521522523, Wood BenchWood Bench FabricationWood Picnic TableWood Picnic Table FabricationWood Serving TableWood Serving Table FabricationConcrete Picnic TableDrinking FountainADA Fish Cleaning StationCampfire RingSteel BBQ GrillsConcrete BarbecuesHot Coal Receptacle, 09/15/202009/15/202008/03/202008/03/202008/03/202008/03/202009/01/202001/25/202107/10/201704/06/202204/06/202204/06/202204/06/2022, Planting NotesTree PlantingShrub PlantingFoliage Protector, Utilities and Drainage NotesTrench RepairDomestic Water Line (3" and Smaller) TrenchDomestic Water Valve (1.5" and Smaller) Without UnionsDomestic Water Valve (1.5" and Smaller) With UnionsDomestic Water Valve (2" to 3")Cleanout To Grade, 06/21/201706/21/201706/21/201706/21/201706/21/201706/21/201706/21/2017, 2950 Peralta Oaks Court,Oakland, CA 946051-888-EBPARKS,1-888-327-2757(Deaf or Hearing Impaired, use the TRS at 711). All of the Water System Replacements must be a looped system that tie back to an EBMUD mainline in order to satisfy EBMUD specifications and regulations. *7 On April 23, 2017, EBMUD and the City entered into a short-term six-month agreement (Short Term Agreement) for EBMUD to provide specific maintenance services for the Navy Water System at Alameda Point (Exhibit 3). The following provides a summary of the key terms of the proposed agreement: Phasing Plan.
Feasibility Study. Thus, the City would remain the customer of record with EBMUD, would receive water from EBMUD through its master meters, and provide water to the Reuse Parcels within Alameda Point through its own water infrastructure until the Water System Replacements are constructed. the necessary planning documents for redevelopment of Alameda Point, including the Master Infrastructure Plan for Alameda Point (MIP). The Feasibility Study is already prepared and approved by EBMUD for the Phasing Plan and is attached to the Water Infrastructure Agreement as Exhibit D. The Feasibility Study shows that through the sale of the buildings with purchase options more than sufficient Reuse Proceeds exist to implement the cost of the Water System Replacements in the Reuse Area, which cost approximately $14.4 million ($5.5 million for Phase 1, $5.9 million for Phase 2, and $3.0 million for Phase 3). [(0o5"-@D ;RPCl7@GP5psRA'"n :'xMMNMXF,K;B_WI"FO6 Is the category for this document correct. On April 23, 2017, EBMUD and the City entered into a short-term six-month agreement (Short Term Agreement) for EBMUD to provide specific maintenance services for the Navy Water System at Alameda Point (Exhibit 3). STANDARD DRAWINGS - East Bay Municipal Utility District.
This Phasing Plan is the Citys current plan for phasing of infrastructure in the Reuse Area based on available information and existing lease and sale agreements in the Reuse Area. Some related job titles are.css-1c1umss{cursor:pointer;font-size:15px;line-height:24px;color:#1861bf;}.css-1c1umss:hover{color:#0c4085;}Commercial Construction Superintendent salaries with median pay of $95,625,Construction Field Superintendent salaries with median pay of $87,298,Construction Inspector salaries with median pay of $86,221,Construction Manager salaries with median pay of $96,097. 1. In order to be a customer of EBMUD, a property owner must have direct access to Water System Replacements. )[\$#0DM!KDx0Xt@"}D Water was supplied to the Navy Water System by East Bay Municipal Utility District (EBMUD) through three master meters located on the perimeter of NAS Alameda. fb`gb`s. $
The estimated total pay for a Construction Superintendent at EBMUD is $87,184 per year. The DIF payments, and any additional proceeds from the sale of land and buildings in the Reuse Area are required by the Navy to be reinvested back into Alameda Point, to implement the New Infrastructure. That said, City staff may attempt to implement some or all of the New Infrastructure, including other wet and dry utilities and surface street reconstruction at the same time as the Water System Replacements to economize on trenching costs, if sufficient Reuse Proceeds exist. Through a series of modifications and extensions the JPA was continued through March 31, 2017. Upon receipt of funds from the sale of the properties within the Reuse Area, the City will oversee the logical implementation of the New Infrastructure in the Reuse Area.
54 0 obj
<>/Filter/FlateDecode/ID[]/Index[49 7]/Info 48 0 R/Length 36/Prev 612274/Root 50 0 R/Size 56/Type/XRef/W[1 2 0]>>stream
Lastly, all future property owners will be notified in a letter from the City, and required to acknowledge in writing, the water infrastructure situation in the Reuse Area and the Water Infrastructure Agreement. Its very important for us! If the Water System Replacements are implemented separately from the other utilities and improvements, there is a marginal premium that the City will be paying, which is estimated at approximately $2 million or three percent of the total cost of New Infrastructure for these three phases. Once the first sale occurs, the City is obligated to commence the design and engineering process for the Water System Replacements for Phase 1. All new development and property transfers to private property owners require the payment of the DIF to fund New Infrastructure. On July 5, 2014, the City of Alameda adopted the Alameda Point Development Impact Fee Ordinance (DIF) consistent with the MIP, which created a required mechanism for financing the New Infrastructure for Alameda Point based on the costs estimated in the MIP and escalated annually. City staff have already retained outside water experts to advise the City in the process and approach to privately contracting these services. Must work extended hours including weekend and holidays as required. For instance, if the Building 91 sale of $3 million occurred first and no other sale occurred within the 30-month timeframe, there would be insufficient Reuse Proceeds to complete the full $5.5 million Phase 1 Water System Replacements or a $2.5 million funding gap. The existing businesses at Alameda Point did not have to pay these charges prior to opening their businesses, which in many cases has been for years, unlike other businesses in the rest of Alameda. How accurate does $57,381 - $132,469 look to you? The Water Infrastructure Agreement (Exhibit 2) is intended to set forth the process of the City and EBMUD working together and the detailed steps that the City will follow to finance and construct Water System Replacements in the Reuse Area and obtain compliance with EBMUDs regulations. See Exhibit C of the Water Infrastructure Agreement for the Phasing Plan, which includes three phases, and indicates the buildings with purchase options. Domestic Water Line (3" and Smaller) Trench, Domestic Water Valve (1.5" and Smaller) Without Unions, Domestic Water Valve (1.5" and Smaller) With Unions. The New Infrastructure includes construction of new EBMUD owned and operated water mains for potable water and fire protection systems compliant with EBMUD specifications and consistent with the MIP (Water System Replacements). Throughout the term of the JPA and short-term agreement, the City remained EBMUDs customer, receiving water to Alameda Point through the same three master meters as the Navy. (Put this form on your Companys letterhead stationery (Date), LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER, Date: Contractor's Name Contractor's Address, 2013 - 2022 studylib.net all other trademarks and copyrights are the property of their respective owners.
This may not be possible given the significant cost of the complete New Infrastructure estimated at $70 million for all phases within the Reuse Area ($18.4 million for Phase 1, $32 million for Phase 2, and $19.4 million for Phase 3) and the agreed upon timeline for complying with this agreement, as described in greater detail below. In addition, the routine maintenance costs will be limited to $10,000 per month or less. If the Water System Replacements are implemented separately from the other utilities and improvements, there is a marginal premium that the City will be paying, which is estimated at approximately $2 million or three percent of the total cost of New Infrastructure for these three phases. Performing this action will revert the following features to their default settings: Performing this action will permanently remove your draft from Yumpu. At the time of sale or at the time the Water System Replacements are implemented (whichever is earlier) all of the tenants and owners who front or will front the Water System Replacements must pay all applicable fees, including the System Capacity Charges (SCC) and the Wastewater Capacity Fees (WCF), which are typically due when a business obtains water service before they open their business. Related Searches:All Construction Superintendent Salaries|All EBMUD Salaries. Must be able to work out of doors in a variety of weather conditions. System Capacity Charges and Credits for Water and Wastewater Use. Your file is uploaded and ready to be published. EBMUD has taken the position that if property sales were to occur in the Reuse Area prior to or without the Water Infrastructure Agreement being executed, then individual parcels would be out of compliance with EBMUDs regulations and would be required to install expensive water main extensions, effectively rendering these projects infeasible or the City may face legal action by EBMUD. The City is required to demonstrate to EBMUD that sufficient Reuse Proceeds exist to implement the Water System Replacements through a feasibility study (Feasibility Study). . The Water Infrastructure Agreement is crucial to moving forward with incremental property sales in the Reuse Area, which allows the City to finance New Infrastructure in this area and attract high intensity employment generating businesses. The City, in consultation with its civil engineering consultants, have prepared a logical and cohesive plan for phasing the infrastructure in the Reuse Area (Phasing Plan) to address upgrades to infrastructure for the parcels with existing leases that include options to purchase. PPO and POS requires employee contributions., EBMUD offers both maternity and paternity leave that enables new parents to spend time with their newborns. The Water Infrastructure Agreement (Exhibit 2) is intended to set forth the process of the City and EBMUD working together and the detailed steps that the City will follow to finance and construct Water System Replacements in the Reuse Area and obtain compliance with EBMUDs regulations. endstream endobj 50 0 obj <> endobj 51 0 obj <>>>/Rotate 270/Type/Page>> endobj 52 0 obj <>stream The Feasibility Study is already prepared and approved by EBMUD for the Phasing Plan and is attached to the Water Infrastructure Agreement as Exhibit D. The Feasibility Study shows that through the sale of the buildings with purchase options more than sufficient Reuse Proceeds exist to implement the cost of the Water System Replacements in the Reuse Area, which cost approximately $14.4 million ($5.5 million for Phase 1, $5.9 million for Phase 2, and $3.0 million for Phase 3).
Are you sure you want to delete your template? The total cost of New Infrastructure is approximately $600 million or $1 million per acre. Recommendation to Authorize the City Manager to Execute a Water Infrastructure Agreement for Alameda Point with East Bay Municipal Utility District (EBMUD) to: (1) Address the Implementation of New Water Infrastructure in the Reuse Area; and (2) Extend the Existing Short-Term Maintenance and Operations Agreement for the Existing Water System and (3) Accept Credits in System Capacity and Wastewater Capacity Fees from EBMUD. On February 4, 2014, the City of Alameda certified the Alameda Point Final EIR in compliance with the California Environmental Quality Act (CEQA). . As described above, the first sale of any of the parcels will generate sufficient Reuse Proceeds to complete the design and engineering process for any phase, and the Feasibility Study demonstrates that sufficient Reuse Proceeds should exist to complete the Water System Replacements for each of the phases in the Phasing Plan. Due to the fact that the Reuse Area is comprised of the NAS Alameda Historic District that constrains the new development process, the buildings within the Reuse Area are planned to be sold and reused incrementally by private property owners on a parcel-by-parcel basis prior to New Infrastructure being constructed. Prior to closure of the former Naval Air Station Alameda (NAS Alameda), commonly referred to as Alameda Point, the United States Navy (Navy) designed, owned and operated the potable water system at Alameda Point (Navy Water System). Copyright 20082022, Glassdoor, Inc. "Glassdoor" and logo are registered trademarks of Glassdoor, Inc. { "name": "Native_infosite_salary_detail_fluid_en-US","id": "div-AdSlot-l6757qxj", "fluid": true }. This design and engineering process is estimated to take approximately 30 months before coming to the City Council with an award of construction contract and then another 18 to 24 months to complete construction for a total of over four years from commencement of design to completion of construction. The phased approach to financing and implementing the New Infrastructure contemplates the City selling parcels to private property owners within the Reuse Area (Reuse Parcels) before direct access to the Water System Replacements is constructed, which is inconsistent with EBMUDs regulations.
The City is required to demonstrate to EBMUD that sufficient Reuse Proceeds exist to implement the Water System Replacements through a feasibility study (Feasibility Study). City staff will bring a subsequent action item to the City Council to provide direction on how the City should allocate these SCC and WCF credits to future users. Must possess a valid California driver's license and have a satisfactory driving record. Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software. average salary for a Construction Superintendent is $75,535 per year in United States, salary trajectory of a Construction Superintendent. For example, a residential project of 800 multi-family housing units would pay approximately $9.4 million and an industrial project of 50,000 square feet would pay approximately $300,000 in SCC and WCF to EBMUD. Property owners within EBMUDs service area must be EBMUDs customers consistent with EBMUDs regulations. The estimated base pay is $87,184 per year. The Final EIR evaluated the environmental impacts of redevelopment and reuse of the lands at Alameda Point consistent with the Alameda Point Zoning Ordinance and MIP, which included the Reuse Area. endstream endobj 53 0 obj <>/Filter/CCITTFaxDecode/Height 1700/Length 46075/Subtype/Image/Type/XObject/Width 2200>>stream The "Most Likely Range" represents values that exist within the 25th and 75th percentile of all pay data available for this role. All of the Water System Replacements must be a looped system that tie back to an EBMUD mainline in order to satisfy EBMUD specifications and regulations. System Capacity Charges and Credits for Water and Wastewater Use. phased replacement of all of the Navys outdated and substandard utility infrastructure, including water, sewer, storm drain, electrical, gas, telecommunications, and surface street improvements. [ Check out the latest Construction Superintendent Jobs or see Construction Superintendent Salaries at other companies. Detailed Implementation Process. Theres an original pension plan and a 2013 plan. This may not be possible given the significant cost of the complete New Infrastructure estimated at $70 million for all phases within the Reuse Area ($18.4 million for Phase 1, $32 million for Phase 2, and $19.4 million for Phase 3) and the agreed upon timeline for complying with this agreement, as described in greater detail below. Until direct access to Water System Replacements can be provided to the Reuse Parcels, the City will continue to provide water to the new owners through the Navy Water System. As part of the Water System Replacement work, the City is required to connect all domestic and fire services to parcels fronting streets that contain the new EBMUD water system to the new EBMUD water main and facilitate owners and tenants becoming EBMUD customers in accordance with EBMUDs regulations. The HMO is fully covered. The New Infrastructure includes construction of new EBMUD owned and operated water mains for potable water and fire protection systems compliant with EBMUD specifications and consistent with the MIP (Water System Replacements). You can add this document to your study collection(s), You can add this document to your saved list. On April 26, 2017, the City and EBMUD entered into a short-term services and operations agreement for six months until the issues surrounding implementing new infrastructure in the adaptive reuse areas at Alameda Point could be resolved, which is the topic of this evenings item. Short Term Agreement for Operations and Maintenance of Existing Water System at Alameda Point, pon acquisition of major portions of Alameda Point from the Navy. EBMUD recognizes that it is in the Citys and EBMUDs mutual interest to work together in implementing the MIP and New Infrastructure, including the Water System Replacements, for Alameda Point. endstream endobj startxref There is no impact to the General Fund as a result of this action.
The Water Infrastructure Agreement allows for other phasing plans to occur as long as they implement improvements that include a looped water system that tie back to an EBMUD mainline and a feasibility study is prepared and approved by EBMUD (see below).
For instance, if the Building 91 sale of $3 million occurred first and no other sale occurred within the 30-month timeframe, there would be insufficient Reuse Proceeds to complete the full $5.5 million Phase 1 Water System Replacements or a $2.5 million funding gap. %PDF-1.3 % This design and engineering process is estimated to take approximately 30 months before coming to the City Council with an award of construction contract and then another 18 to 24 months to complete construction for a total of over four years from commencement of design to completion of construction. hb```f`` z^ a0p/roTC%|cY"N`/d330d`2p-@| As part of the design and engineering process, City staff will evaluate whether sufficient Reuse Proceeds exist to complete not just the Water System Replacements, but all or some portion of the New Infrastructure and be part of any subsequent recommendation to the City Council. No further review is required for this review of this agreement. Until direct access to Water System Replacements can be provided to the Reuse Parcels, the City will continue to provide water to the new owners through the Navy Water System. uz] H*2430P A3CN$r{(sr
See Exhibit C of the Water Infrastructure Agreement for the Phasing Plan, which includes three phases, and indicates the buildings with purchase options. As shown in Exhibit D of the Water Infrastructure Agreement, the City expects the first parcels to sell to be Building 9 and 91 within Phase 1 of the Phasing Plan. These credits could be used to offset the SCC and WCF for new projects in the Development Area and new businesses in the Reuse Areas at the City Councils discretion. Thus, the City would remain the customer of record with EBMUD, would receive water from EBMUD through its master meters, and provide water to the Reuse Parcels within Alameda Point through its own water infrastructure until the Water System Replacements are constructed. Map of Reuse and Development Areas, 2. The Navy Water System was neither built, nor maintained to the standards of EBMUD. This provides a greater credit amount to the City because the credits are based on a 10-year historic average of water use, which is higher now than when the master meters will actually be eliminated, as water usage will gradually decrease over time as water improvements are constructed and there is lower usage of water flowing through the Navys former master meters. As part of the Water System Replacement work, the City is required to connect all domestic and fire services to parcels fronting streets that contain the new EBMUD water system to the new EBMUD water main and facilitate owners and tenants becoming EBMUD customers in accordance with EBMUDs regulations.
DCD [*aN[b!| ]8 D|.D`J3X.9QI8DGr,/xav". EBMUD does not want to continue to operate the Navy Water System. Must possess the physical characteristics to perform the critical and important duties of the class. As described above, the Water Infrastructure Agreement provides the detailed steps that the City will follow to implement the Water System Replacements in the Reuse Area to obtain compliance with EBMUD regulations.
That said, EBMUD has agreed to give the City a credit for the future elimination of the three master meters of $19.5 million for SCC and $7 million for WCF at the time the Water Infrastructure Agreement is executed instead of at the later date when the master meters are actually eliminated (see Exhibit E of the Water Infrastructure Agreement). 000 - 099: General100 - 199: Bollards200 - 299: Fences and Gates300 - 399: Sign Installation400 - 499: Roads, Trails, and Parking500 - 599: Furnishings600 - 699: Planting and Irrigation700 - 799: Utilities and Drainage800 - 899: Miscellaneous, Abbreviations Painting and Staining Specification, Fixed Steel BollardRemovable Steel Pipe BollardRemovable PVC Bollard, One-Rail Wood FenceTwo-Rail Wood FenceSplit Rail Wood FencePipe Gate InstallationPipe Gate FabricationTrail Service GatesPlank Gate, 07/08/202210/11/202111/19/202104/06/202204/06/202204/06/202204/06/2022, Steel Pipe Sign PoleSingle Wood Sign PostPark Entry Wood Sign-Post Mount, Standard Parking StallAccessible Parking StallsConcrete Wheel StopRegional Trail Entry StructuresControlled Vehicle Entry, 12/08/201511/19/202111/19/202105/14/202110/11/2021, 503503F504504F507507F510515518520521522523, Wood BenchWood Bench FabricationWood Picnic TableWood Picnic Table FabricationWood Serving TableWood Serving Table FabricationConcrete Picnic TableDrinking FountainADA Fish Cleaning StationCampfire RingSteel BBQ GrillsConcrete BarbecuesHot Coal Receptacle, 09/15/202009/15/202008/03/202008/03/202008/03/202008/03/202009/01/202001/25/202107/10/201704/06/202204/06/202204/06/202204/06/2022, Planting NotesTree PlantingShrub PlantingFoliage Protector, Utilities and Drainage NotesTrench RepairDomestic Water Line (3" and Smaller) TrenchDomestic Water Valve (1.5" and Smaller) Without UnionsDomestic Water Valve (1.5" and Smaller) With UnionsDomestic Water Valve (2" to 3")Cleanout To Grade, 06/21/201706/21/201706/21/201706/21/201706/21/201706/21/201706/21/2017, 2950 Peralta Oaks Court,Oakland, CA 946051-888-EBPARKS,1-888-327-2757(Deaf or Hearing Impaired, use the TRS at 711). All of the Water System Replacements must be a looped system that tie back to an EBMUD mainline in order to satisfy EBMUD specifications and regulations. *7 On April 23, 2017, EBMUD and the City entered into a short-term six-month agreement (Short Term Agreement) for EBMUD to provide specific maintenance services for the Navy Water System at Alameda Point (Exhibit 3). The following provides a summary of the key terms of the proposed agreement: Phasing Plan.